Track Record

Engineering, Procurement & Construction

Unit Client / Location Work Scope Duration
1

Larsen & Toubro Limited

Deen Dayal West Field Development    

Construction for N14 jackect & N17, piles and conductor – ONGC (Mumbai high field) 2545 mt          

Tonnage 2,545 ton & 2,770mt

May 2010 – Jan 2011

2

Larsen & Toubro Limited/GSPC

Deen Dayal West Field Development    

Fabrication, loadout and seafastening of 6 legged jacket.  Tonnage 4,530

Apr 2010 – Jan 2011

3

Newfield Peninsular Malaysia Inc.

PM329 East Piatu Development Project

Provision of fabrication, procurement, commissioning, loadout and seafastening of topside, CPP, living quarter and bridge of East Piatu development.  Tonnage 4,161 mt

Jul 2010 – Aug 2011

4

Murphy Sarawak 

PC of WP-PA Topside

Fabrication and erection of coller deck structure, piping work, equipment function test, load-out and sea-fastening.  Tonnage 590 mt

Jun 2002 – Oct 2002

5

Newfield Malaysia

PC of West Belumut WHP – Jacket & Topside

Provision of procurement, construction of jacket and topside.  Tonnage 1.153 mt   

May 2009 – Feb 2010

6

Petrofac Malaysia 

EPC Berantai Field Development Project – Topside & Jacket

EPCC of wellhead platform (WHP-I) and the Angsi field tie-in at the Andre-A platform for Berantai field development project, block PM309.  Tonnage 1,400 mt & 1,600 mt

Dec 2010 – Sep 2011

7

Petrofac Malaysia 

SEPA-EPC of Process Skids & Refurbishment of MOPU   

EPCIC subcontract for mobile offshore production unit (MOPU) and wellhead support structure (WHSS) for Sepat early production system (EPS) for PCSB.  Tonnage 1,200 mt    

Mar 2011 – Sep 2011

8

Murphy Malaysia

FEPCIC – Wellhead Platform for Patricia

Engineering, procurement, construction and commissioning (EPCC) of Patricia satellite.  Tonnage 1,285 mt

Aug 2011 – Mar 2011

9

Afcons – Gunanusa Joint Venture / ONGC (India)

ICP-R and ICP-F3 Jackets   

Construction & onshore precomm of ICP-R, ICP-F3 jackets and piles.  Tonnage 6,004 mt

Aug 2009 – Dec 2010

10

Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)

KBB Substructure for Kebabangan Northern Hub Development   

Engineering, procurement, fabrication, inspection, testing and pre-commissioning, loadout & seafastening of KBB substructure, 8-legged jacket.  Tonnage 13,393 mt

Apr 2011 – Sep 2012

11

Petronas Carigali Sdn Bhd

Tangga Barat Cluster Development

Procurement and construction of Tangga Barat cluster development project (TBDR-A).  Tonnage 5,013 mt

Mar 2008 – May 2009

12

Exxon Mobile Exploration and Production Malaysia Inc.

PC-Fabrication of Tapis R Jacket   

Procurement, fabrication, testing, loadout & tie-down of Tapis R jacket, piles & appurtenance. 

Tonnage 5,475 mt

Mar 2012 – Jul 2013

13

Brunei Shell Petroleum Company Sdn Bhd 

AMPA-9 Compression Module   

Engineering, procurement & construction of AMPA-9 compression module. 

Tonnage 1,400mt

Dec 2011 – Jan 2013

14

PT Sempec Indonesia

ONGC – Heera Redevelopment Project

Fabrication of 4 nos.  Wellhead platform of deck, jacket, pile & conductors Heera development project. 

Tonnage 13,056 mt

May 2007 – Nov 2008

15

Murphy Sarawak Oil Co Ltd

EPC of Patricia Satellite for SK309/311 Sarawak Development Project

Engineering, procurement and construction (EPC) of Patricia satellite (PT-SA) substructure and Serendah wellhead platform (WHP) template for SK309/311 Sarawak development project field developemnt. 

Tonnage 4,500mt     

2012 – 2013

16

Kencana Mermaid Drilling Sdn Bhd

Self Erected Tender Rig & Derrick Equipment Set (KM-I)

Design, construction & completion of self erected tender rig and derrick equipment set. 

Tonnage 8750 mt

2009 – 2010

17

Bechtel – Wheatstone LNG Plant – ISBL Modules

Wheatstone Project LNG Plant – Module Fabrication ISBL

PC – Wheatstone LNG plant – ISBL modules. 

Tonnage 65,909 ton

2011 – present

18

Cameron Limited / BHP Biliton (Australia)

BHP Pyrenees    

Engineering, procurement and construction of subsea manifolds and foundation mud mats. 

Tonnage 810 mt   

2007 – 2009

19

Aker Kvaerner (M) Sdn Bhd / Reliance Inductries Limited Ltd (India)

Reliance KG-D6

9 units : 3 manifolds, 6 suction anchors for manifolds, I DWPLEM with suction anchor, I UDH with suction anchor, 3 SDA with suction anchors. 

Tonnage 2,337 mt    

2006 – 2007

20

FMC Wellhead Equipment Sdn Bhd (Malaysia)  

Gumusut Kakap    

5 subsea Wellhead Equipment Sdn Bhd (Malaysia).  Tonnage 600 mt

2008 – 2009

21

Bumi Armada

M20, Bumi Armada

Engineering, procurement & construction

2008 – 2009

22

Prosafe Production Services Pte Ltd

Prosafe Azurite Development Module Construction   

Detail engineering for electrical module and work drawings for all other module, procurement, fabrication, assemble, erection T&C     

2007 – 2008